KÜÇÜKÇEKMECE NURTEN STREET UNDERGROUND PARKING PROJECT

City/Country: İSTANBUL/TÜRKİYE

Location: ISTANBUL

 

  • 8083.84 m² Project Area
  • Floor construction area 2020.96 m²
  • 169 car capacity (5% disabled parking lot, 1% electric parking lot)
  • 4-Storey Car Park + Park Design

The project area is located on Nurten Street in Safran Mahallesi, Küçükçekmece District, between Beyaz Sokak and Kurutürk streets. In the project, there are 4 underground parking floors and a parking area on the ground.

With this project, it is aimed to meet the parking needs of the region. It is aimed that the project will serve the public with the underground bus car park and automobile car park.

The parking lot structure has an area of approximately 8083.84 m² and consists of 4 floors. The floor construction area is 2020.96 m². A parking lot, which is navigated with ramps between floors, has been planned. The floor height is 4.50 m on the first floor and 3.50 m on the other floors. has been planned. The capacity of the car park is 169 cars. There are an average of 45 vehicles on each floor. 5% of the number of parking lots is planned as disabled parking lot and 1% electric parking lot.